Design and Geotechnical Investigation of new BG line between Jorhat & Sivsagar
Client
NF Railway, Bogibil Div.
Location
Assam
Service CategoryGeological Mapping, Geotechnical SectorRailway Engineering
To accelerate the economic development of Upper Assam and for easement of goods and passenger transportation to the regions the project is of national developmental importance.

The new proposed 61.6km BG line will not only complete Jorhat-Sivsagar-Moran-Dibrugarh axis but also will act as a parallel to Dibrugarh-Guwahati mainline via Tinsukia and Simaluguri.
We as a railway DPR consultant have undergone detailed engineering survey to finalize the alignment and prepare all alignment and cross drainage works drawings and have prepared the detailed cost estimate of the project.
The tasks performed during the project work are as follows:
- Reconnaissance Survey
- Alignment finalization and fixation
- Detailed Engineering survey
- Geotechnical Investigation
- Laboratory tests on soil & rock samples
- Hydrology Analysis
- L-Section Preparation
- Yard Plans preparation
- GAD of Bridges
- Preparation of Soil investigation report
- Detailed cost estimate and DPR.